5G GRID
5G / LTEHigh-gain outdoor cellular CPE
Chargement du prix et du stock…
Overview
| Product type | Directional outdoor 5G CPE |
|---|---|
| Mobile networks | 5G Sub-6 GHz · 4G LTE |
| Spatial diversity | 4×4 MIMO |
| 5G SA maximum rate | 2.4 Gbps downlink · 900 Mbps uplink |
| 5G NSA maximum rate | 3.4 Gbps downlink · 550 Mbps uplink |
| LTE maximum rate | 1.6 Gbps downlink · 200 Mbps uplink |
| Antenna gain | Up to 22 dBi |
| Ethernet | 1× 2.5 GbE |
| SIM | 1 SIM slot |
| Weather protection | IP65 |
Cellular & Antenna
| Cellular standard | 3GPP Release 16 |
|---|---|
| LTE category | Cat 19 |
| Antenna type | Integrated directional MIMO grid |
| Antenna frequency | 1,710–4,200 MHz |
| 5G SA / NSA bands | n1 / n3 / n5 / n7 / n8 / n20 / n28 / n38 / n40 / n41 / n71 / n75 / n76 / n77 / n78 |
| LTE FDD bands | B1 / B3 / B5 / B7 / B8 / B20 / B28 / B32 / B71 |
| LTE TDD bands | B38 / B40 / B41 / B42 / B43 |
| WCDMA bands | B1 / B5 / B8 |
Hardware
| Chipset | Qualcomm Snapdragon X62 5G |
|---|---|
| USB | 1× Type-C |
| Reset | Reset button |
| Power | 24–48 V passive PoE |
| Size | 60 cm |
| Weight | 3.5 kg |
| Operating temperature | −20 to +50 °C |
| Storage temperature | −20 to +70 °C |
| Operating humidity | 5–95%, non-condensing |
| Color | White |
Networking & Management
| SMS | Supported |
|---|---|
| APN configuration | Supported |
| Band lock | Supported |
| PCI / cell lock | Supported |
| AT command interface | Supported |
Cellular rates are theoretical maxima. Actual performance depends on network coverage, operator configuration, antenna alignment and installation conditions. Band availability depends on the installed cellular module and region.
In the box
Supplied components for 5G GRID.
5G GRID, in detail.
Explore the original product views.
Complete the installation.
Connection and mounting requirements for 5G GRID.
Mobile service
An active SIM and a compatible LTE / 5G data plan.
Check your deployment configurationMounting support
Use suitable outdoor mounting hardware for the deployment.
Check your deployment configurationPower input
24–48 V passive PoE
Check your deployment configurationInstall. Connect. Configure.
Deployment checklist for 5G GRID.
Prepare the SIM
With power disconnected, insert an active SIM for a compatible mobile network.
Mount the CPE
Secure the unit with the appropriate mounting hardware. Optimize its location for cellular reception.
Connect power and Ethernet
Connect the documented PoE supply and Ethernet network. Seal the outdoor cable entry.
Configure cellular access
Set the operator APN as required and verify network registration, signal quality and data connectivity.

